Siemens installed a combined-cycle gas turbine power plant in Timelkam, Austria. The 408 MW plant features a single-shaft configuration, in which the gas turbine, generator and steam turbine are connected inline to form a 45 m long power train.

Siemens installed a combined-cycle gas turbine power plant in Timelkam, Austria. The 408 MW plant features a single-shaft configuration, in which the gas turbine, generator and steam turbine are connected inline to form a 45 m long power train.

Leave a Reply