Fast-Tracking a Control System Retrofit

Upgrading a 1970s-era generator control system to new millennium technology in 12 days during a three-week shutdown would require careful planning and teamwork under any circumstances. The quick replacement of the governor and control system at the PT Inco smelter’s hydroelectric generation system is even more impressive because the facility is located in the middle […]

FIRST M7A-03D-DRIVEN POWER GENERATION SYSTEM

GPB80D gas turbine power generation system powered by a Kawasaki 7000 kW Class M7A-03D gas turbine. A Munksjö Paper production plant, located in Unterkochen, Germany, is the site of the first GPB80D gas turbine power generation system powered by Kawasaki’s 7000 kW class M7A-03D gas turbine. The order was received by the German subsidiary of […]