Power Industry News

Find here quality News, Articles, Stories, Case Studies, Latest Information about World of Power Industry

JC Carter LLC, the cryogenic submerged motor pump company, is to design and manufacture 22 third generation pumps for the liquefied natural gas (LNG) terminal that is being built on Jurong Island, Singapore.

The JC Carter pump order is based on the three storage tanks that are now under construction on Jurong Island, and consists of three in-tank send-out pumps per tank, two reloading pumps per tank, six total high pressure booster pumps and one LNG drain pump.

The in-tank pumps will supply LNG to the high pressure pumps, which send out the LNG at high pressure to the vaporizers, which gasify the LNG and deliver it through pipelines to Singapore’s natural gas customers. The reloading pumps reload the cargo ships to export LNG to other countries, and the LNG drain pump is used periodically for maintenance to empty the tanks.

Categories: News

You must be logged in to post a comment.

Popular Posts

PV Sales in the U.S.

Solar panel prices have taken a 10% tumble since October ...

Voith Turbo BHS Getr

Voith Turbo BHS Getriebe, a leading turbo gearbox manufacturer worldwide, ...

Clean Power at the B

Clean Power at the Black Sea’s Shore (Source: Siemens Energy) Siemens ...

Wärtsilä developin

Wärtsilä one of leading companies in research programme for developing ...

Conversions in Every

converted Mirrlees Blackstone K9 Major diesel engine. The conversion work ...

Sponsors

  • RSS
  • Forums
  • Facebook
  • Google+
  • LinkedIn
  • Twitter
  • Digg
  • Flickr
  • YouTube
  • Delicious
  • Unifyer
  • Pinterest