Daimer Industries Inc has introduced the Super Max 15500AST

Daimer Industries Inc has introduced the Super Max 15500AST, a new line of heated, stationary, electric water pressure washers.

The Super Max 15500AST can use variable temperatures of cold water, hot water up to 220ºF as well as wet steam up to temperatures of 330ºF. The Super Max 15500AST power washing machines offer pressures of 1000 psi, flow rates reaching 4 GPM and are powered by 3.0 horsepower electric motors.

The power washers on the Super Max 15500AST offer a 9 gallon fuel capacity for oil, kerosene or diesel. The 15500AST includes a heavy duty schedule 80 heating coil. The machines offer chemical infusion using high-pressure injection. The equipment features automatic shut-off technology which closes down expensive components when the machine is idle for thirty seconds.

The Super Max 15500AST from Daimer Industries Inc includes: assorted nozzles, an extra long hydraulic hose, a trigger wand sporting quick disconnect, and a steel, high gloss, powder-coated case. Optional features include wet sandblasting and multi-gun operation.

Source: http://www.daimer.com/

Leave a Reply

Advertise Here!

Advertise Here!

Archives

RSS Renewable Energy News From Powermag

  • Venezuela's Power System on Brink of Collapse March 1, 2010
    Venezuela, a country that relies on hydropower for almost three-quarters of its electricity, has been battling a deepening electricity crisis since a drought in 2009 and a sudden 7% surge in demand brought the country’s power system to the brink of collapse.... […]
  • Peru: The Potential to Become a Regional Energy Hub March 1, 2010
    Water and gas provide the energy for Peru’s power generation sector, and the country could generate considerably more, especially from hydro and wind. While the nation strives to extend electricity service to all its citizens, it’s also looking beyond its borders for potential future customers.... […]
  • Ethiopia's New Hydro Plant Boosts Region's Generating Capacity March 1, 2010
    Ethiopia in mid-January officially inaugurated the 420-MW Gilgel Gibe II hydropower project, the second hydropower plant to be opened since November 2009, when the 300-MW Tekezé project began operations.... […]
  • Plant Efficiency: Begin with the Right Definitions February 1, 2010
    The race is on to claim the title of "most efficient coal-fired power plant" on the planet. However, it’s tricky identifying finalists because of the widespread misuse of the term "efficiency" and all those nagging assumptions. Let’s first establish clear definitions and then identify the title contenders.... […]
Sedo - Buy and Sell Domain Names and Websites project info: lakho.com Statistics for project lakho.com etracker® web controlling instead of log file analysis