Wilden has designed the H25 and H38 advanced series metal piston pumps

Wilden has designed the H25 and H38 advanced series metal piston pumps for use in applications that feature very low volumes with high discharge pressures.

The H25 pump uses a simplex-action piston to create approximately a 13:1 pressure ratio of discharge fluid to inlet air supply to generate up to 110.3 bar (1,600 psig). The H38 model uses a double-action piston to create a 26:1 pressure ratio of discharge fluid pressure to inlet air supply to generate up to 220.6 bar (3,200 psig).

These capabilities make the H25 and H38 advanced series metal piston pumps the most cost-effective solution for applications that require discharge pressures greater than the 1:1 pressure ratio that is traditionally inherent in most AODD pumps.

The maximum flow rate for the H25 is 4.1 lpm (1.1 gpm) and the maximum flow rate for the H38 is 7.6 lpm (2 gpm), with a maximum inlet air pressure of 8.6 bar (125 psig). Both the H25 and H38 advanced series metal piston pumps feature wetted housings that are made of aluminum. The H25 has a maximum suction-lift capability of 7.8m dry (25.5’), while the H38’s suction-lift capability is 7.1m dry (23.2’).

Leave a Reply

Advertise Here!

Advertise Here!

Archives

RSS Renewable Energy News From Powermag

  • Venezuela's Power System on Brink of Collapse March 1, 2010
    Venezuela, a country that relies on hydropower for almost three-quarters of its electricity, has been battling a deepening electricity crisis since a drought in 2009 and a sudden 7% surge in demand brought the country’s power system to the brink of collapse.... […]
  • Peru: The Potential to Become a Regional Energy Hub March 1, 2010
    Water and gas provide the energy for Peru’s power generation sector, and the country could generate considerably more, especially from hydro and wind. While the nation strives to extend electricity service to all its citizens, it’s also looking beyond its borders for potential future customers.... […]
  • Ethiopia's New Hydro Plant Boosts Region's Generating Capacity March 1, 2010
    Ethiopia in mid-January officially inaugurated the 420-MW Gilgel Gibe II hydropower project, the second hydropower plant to be opened since November 2009, when the 300-MW Tekezé project began operations.... […]
  • Plant Efficiency: Begin with the Right Definitions February 1, 2010
    The race is on to claim the title of "most efficient coal-fired power plant" on the planet. However, it’s tricky identifying finalists because of the widespread misuse of the term "efficiency" and all those nagging assumptions. Let’s first establish clear definitions and then identify the title contenders.... […]
Sedo - Buy and Sell Domain Names and Websites project info: lakho.com Statistics for project lakho.com etracker® web controlling instead of log file analysis